Shipping a cellular device to the US: bands, networks and approvals
Three nationwide networks carry almost every cellular device in the United States: AT&T, Verizon, T-Mobile. A device meant for all three should carry their main bands, B2, B4, B5, B12, B13, B17, B66, B71; the low bands (below 1 GHz) decide rural and indoor coverage.
1. Bands by carrier
| Carrier | 4G LTE | 5G NR (confirmed) | Coverage layer | Evidence |
|---|---|---|---|---|
| AT&T | B2 B4 B5 B12 B14 B17 B29 B30 B66 | n5 n77 n260 | B5 B12 B14 B17 B29 | A |
| Verizon | B2 B4 B5 B13 B46 B48 B66 | n2 n5 n66 n77 n260 n261 | B5 B13 | A |
| T-Mobile | B4 B5 B12 B66 B71 | n25 n41 n71 | B5 B12 B71 | A |
Bold: the carrier’s main bands; a module that lacks one of them is not rated good on that network. Full tables, sources and module verdicts are on each carrier’s page.
2. One module for all three
To be rated good on all three networks a module needs each carrier’s main bands: AT&T B2 B4 B5 B12 B17; Verizon B13; T-Mobile B12 B66 B71. Of the 44 models in the atlas, 12 are good on all three:
- JACS TD191-B · USB dongle · Cat 4
- Nordic nRF9160 · LTE-M / NB-IoT
- Quectel BG77 · LTE-M / NB-IoT
- Quectel BG770A-GL · LTE-M / NB-IoT
- Quectel BG95-M3 · LTE-M / NB-IoT
- Quectel BG96 · LTE-M / NB-IoT
- Quectel EC25-AF · Cat 4
- Quectel RG255C-GL · 5G RedCap
- Quectel RM520N-GL · 5G Sub-6
- SIMCom SIM7080G · LTE-M / NB-IoT
- Telit ME910C1-WW · LTE-M / NB-IoT
- u-blox SARA-R510M8S · LTE-M / NB-IoT
3. LTE-M, NB-IoT, RedCap and 5G standalone
| Carrier | LTE-M | NB-IoT | RedCap | 5G SA |
|---|---|---|---|---|
| AT&T | live · B2 B4 B12 | switched off 2025-Q1 | live 2025-07 | live 2025-10 |
| Verizon | live | live | not confirmed | live 2025 |
| T-Mobile | live · B2 B12 | live · B2 B4 B12 | live | live 2020 |
4. What has been switched off
2G and 3G are gone on all three networks; a device that falls back to GSM or UMTS has nothing to fall back to.
| Date | Carrier | Technology | Status |
|---|---|---|---|
| 2017 | AT&T | 2G | switched off |
| 2022 | AT&T | 3G | switched off |
| 2022-03-31 | T-Mobile | 3G (Sprint CDMA) | switched off |
| 2022-06-30 | T-Mobile | 4G (Sprint LTE) | switched off |
| 2022-07-01 | T-Mobile | 3G (UMTS) | switched off |
| 2022-12-31 | Verizon | 2G/3G (CDMA) | switched off |
| 2026-08-03 | T-Mobile | 2G (GSM) | switched off |
5. Approvals: FCC first, then PTCRB and the carrier
Three layers, in this order.
- FCC equipment authorization
Every cellular transmitter needs an FCC ID under the Certification procedure, granted through a Telecommunication Certification Body. A module’s own grant can be reused by the host device when the module’s conditions are kept. - PTCRB
The certification board set up by North American operators. AT&T and T-Mobile require it before their own programmes; using a PTCRB-certified module shortens the device’s test plan. - Carrier programmes
AT&T: IoT network certification, built on PTCRB. T-Mobile: its own device certification, after FCC and PTCRB. Verizon: the Open Development certification process, with testing at approved labs.
Source: FCC · Equipment authorization · PTCRB · T-Mobile · IoT device certification: OEM prerequisites · AT&T · IoT devices: get certified · Verizon · Open Development device certification process
6. Four things that changed recently
UScellular is now part of T-Mobile
T-Mobile closed its purchase of UScellular’s wireless operations and part of its spectrum on 1 August 2025; network integration follows in phases. Plan for T-Mobile’s bands in former UScellular areas.
Source: Converge Digest · T-Mobile closes acquisition of UScellular wireless operations (1 Aug 2025)
Boost Mobile no longer builds a fourth network
EchoStar sold spectrum to AT&T (about 30 MHz at 3.45 GHz and 20 MHz at 600 MHz) and to SpaceX; the FCC approved the sales in May 2026. Boost runs as a hybrid operator on AT&T’s network.
Source: Reuters · FCC approves sale of EchoStar spectrum to SpaceX and AT&T (12 May 2026) · Broadband Breakfast · EchoStar, AT&T close spectrum sale (28 Jul 2026)
AT&T ended NB-IoT
AT&T’s NB-IoT network was switched off in early 2025; on AT&T, low-power devices use LTE-M.
Source: Light Reading · AT&T to discontinue NB-IoT, but T-Mobile and Verizon keep the faith
Modules on the FCC Covered List cannot be authorized inside a product
FCC rules published on 25 November 2025 prohibit authorizing any product that incorporates a modular transmitter that is covered equipment. Check the current Covered List before choosing a module supplier; the list has been extended several times in 2026.
Source: Federal Register · FCC, equipment authorization and the Covered List (25 Nov 2025) · FCC · Covered List
These four notes rest on the sources named beside them and were checked on 2026-11-20; rules and deals move, so confirm with the source before a design decision.
Go deeper
The US country page: every band, coverage and sources · Choosing a module for the US · Approvals by country