Skip to content

Odido (Netherlands): 4G and 5G bands

Checked 2026-10-02

Odido (Netherlands) runs 4G on B1, B3, B7, B8, B20, B38; B8, B20 are the coverage layer. 5G bands: n28, n78. 5G SA: not found; RedCap: not launched; 3G: no earlier than august 2026; 2G: switched off (2023).

Check your module in Netherlands

Results cover the 3 networks here; the home page checks every country at once.

Bands in detail

BandNameDuplexUplink MHzDownlink MHzLayerChecked
B12100 IMTFDD1920–19802110–2170capacity layercross-checked12
B31800 DCSFDD1710–17851805–1880capacity layercross-checked12
B72600 IMT-EFDD2500–25702620–2690capacity layercross-checked12
B8900 E-GSMFDD880–915925–960coverage layercross-checked12
B20800 Digital DividendFDD832–862791–821coverage layercross-checked12
B382600 IMT-E TDDTDD2570–26202570–2620capacity layercross-checked12
n28700 APTFDD703–748758–803coverage layercross-checked12
n783500 C-BandTDD3300–38003300–3800capacity layersingle source1

Frequencies are from the 3GPP specifications. “Single source” means only one community source lists the band; it is shown but not scored.

Network status

5G SANot found
RedCapNot launched3
LTE-MCommercial4
NB-IoTCommercial4
2GSwitched off (2023)5
3GNo earlier than August 20266

Our dongles on this network

  1. MF833V✔ Good88%

    Supports B1, B3, B7, B8 (coverage layer), B20 (coverage layer). Missing B38.

  2. Dongle 400✔ Good88%

    Supports B1, B3, B7, B8 (coverage layer), B20 (coverage layer). Missing B38.

  3. F40◐ Limited63%

    Supports B1, B3, B8 (coverage layer), B38. Missing the operator’s main band B20. Missing B7.

    5G: 5G bands match, but no commercial RedCap yet (n28)

Check another module →

Sources

  1. C Frequency checker · Netherlands Kimovil · 2026-10-02
  2. C T-Mobile (Netherlands), rebranded Odido in September 2023: frequency bands FrequencyCheck · 2026-10-02
  3. B 5G RedCap – April 2026 (42 operators in 27 markets; 14 commercial launches) GSA · 2026-04
  4. B Mobile IoT network launches (Nov 2025) GSMA · 2025-11
  5. A Consequences of switching off 2G and 3G: KPN and VodafoneZiggo have ended 3G, Odido at the earliest in August 2026; Odido has ended 2G, KPN in December 2027, VodafoneZiggo not before end-2026 ACM · 2024-12
  6. B Odido keeps 3G until at least 1 August 2026 and will announce the date at least six months ahead Emerce · 2024

Suggest a correction

Page:

We keep only what you type here; IP addresses are stored as a one-way hash, to prevent abuse.